Tube clamp INKO-M TC-ME26 PP
For module base units from 6 to 20mm tubing: position the first half part of the tube clamp into the steel module base before placing the tubing. Add the second half part and a pressure plate before fixing with the lock plate. To add an additional level to the module: release the lock plate and remove the pressure plate on top of the clamp halves surrounding the tubing. Place a single bolted module base where the pressure plate was and retighten using the lock plate. For module base units from 21 to 42mm tubing: place a base plate and then the first half part of the tubing clamp into the steel module base before placing the tube. Add the second half part and a top pressure plate before fixing with the lock plate. To add an additional level to the module: Release the lock plate and remove the pressure plate on top of the clamp halves surrounding the tubing. Place a single bolted module base where the pressure plate was and retighten using the lock plate.
Product variants
Filter product
Characteristics
Name | Value |
---|---|
Weight (kg) | 0.010 |
X (mm) | 24.8 |
Y (mm) | 45 |
Z (mm) | 33.8 |
D1 Diameter (mm) | 25.4 1” |
Torque (Nm) | 16 |
Type | Standard |
Tubing Size (mm) | 26 |
ETIM class | EC000368 - Tube clamp |
Downloads
Name | Classification | Size |
---|---|---|
User Guide | 317 kB |